| (i) |
The Corporation had
transported Over Dimensional Cargo (ODC) for Numaligarh Refinery Project, Assam. This
Corporation proved its importance in movement of ODC cargo in the North-Eastern Region
having inherent transportation bottlenecks.
|
| (ii) |
ONGCs Oil rigs
were transported by CIWTC Ltd. along with some Bangladesh Operators to Bangladesh and back
to India within scheduled time frame.
|
| (iii) |
A new loading /
unloading front at Rajabagan Dockyard, especially for ODC cargo and timber, has been
opened up.
|
| (iv) |
Stone chips from
Varanasi to Narayanganj, a distance of 2200 Kms.
|
| (v) |
A Pollution Control
vessel, built in Rajabagan Dockyard, was delivered to CPT.
|
| (vi) |
Cargo from Assam to
Bangladesh have started moving following amendment in Indo-Bangladesh Protocol.
Top |